SECTOR — OBSERVATORY
STATION / SUNX-DXB-01 TARGET / SOL — G2V STAR
SOLAR OBSERVATORY 24.7563° N · 55.3661° E — MBR Al Maktoum Solar Park, Dubai

Our power plant is 150 million km away.

We build the machinery that catches it. SunX Solar is a utility-scale solar construction contractor — micro piling, tracker & module installation and robotic cleaning systems on the UAE's flagship DEWA programmes.

--°
Solar elevation — live
--°
Solar azimuth — live
--:--
Sunrise · Dubai
--:--
Sunset · Dubai
--h
Daylight today
--
167.5 MW of our trackers
LIVE — COMPUTED FOR 24.7563°N 55.3661°E · EVERY TRACKER WE INSTALLED IS FOLLOWING THIS SUN RIGHT NOW
0MW
Trackers & modules installed
0+
Foundations delivered
0
Piles pipeline — DEWA III
ISO ×3
9001 · 14001 · 45001 certified
OBS-01 / What we own

Between that star and the grid,
three verticals are ours.

We work as a specialist subcontractor inside major EPC programmes — taking the on-site execution scope from surveyed sand to string-ready rows.

OBS / PILINGAuger drilling rigs installing micropiles in the desert

Micro Piling Works

Foundations · Ø300 mm · auger & DTH
  • Survey & stakeout from EPC control points
  • Auger / DTH drilling to design depth
  • Pile installation, verticality & alignment
  • Concrete casting & stub setting
  • Pre / post-pour inspection & RFI
OBS / MECHANICALSingle-axis tracker structures under installation

Mechanical Installation

Trackers · torque tubes · modules
  • Tracker & torque tube installation
  • Brackets, dampers & component fixing
  • Module installation & clamping to spec
  • Row alignment & accessories
  • Inspection & punch closure
OBS / ARCSInstalled module rows ready for robotic cleaning systems

ARCS Works

Robotic cleaning · yield protection
  • Robotic cleaning system installation
  • ARCS fixing & alignment to trackers
  • Sequencing with tracker & module fronts
  • Functional & travel testing support
  • Punch closure & documented handover
OBS-02 / Delivery systems

Everything an EPC plugs into,
already running.

24/7
Day & night shift execution — fronts never sleep
SYS / QAQC

QA / QC

ITPs, RFIs, pre & post-pour inspections, NCR close-out, full traceability.

SYS / HSE

HSE

ISO 45001 system — inductions, permits, heat-stress plans, zero-harm culture.

SYS / PLAN

Planning & progress

DPRs, lookaheads and productivity tracked against the EPC schedule daily.

SYS / SURVEY

Survey control

Instrument teams setting out every pile from EPC control points.

SYS / PLANT

Plant & machinery

Auger and DTH drilling rigs, ramming machines, compressors and site plant — maintained, inspected and logged in-house.

SYS / LOGISTICS

Logistics & stores

Free-issue handling, block-level material shifting, traceable stores.

SYS / DOCS

Document control

Submittals, inspection records and handover packs — versioned, retrievable.

OBS-03 / How a front moves

Mobilisation to handover,
inspection-driven.

The same repeatable workflow runs every block — surveyed before drilled, inspected before cast, documented before handed over. The line below walks itself through all ten stations.

ST-01

Mobilization

Crews, rigs and supervision deployed to the block.

ST-02

Survey

Pile positions set out from EPC control points.

ST-03

Material shifting

Free-issue material moved to the front, traceable.

ST-04

Drilling / ramming

Method matched to strata; daily output vs. lookahead.

ST-05

Alignment

Position, plumb and level held within tolerance.

ST-06

Inspection / RFI

QA/QC sign-off before any concrete is poured.

ST-07

Concrete / install

Casting, stub setting or mechanical installation.

ST-08

QA/QC checks

Records and traceability captured per pile, per row.

ST-09

Punch closure

NCRs and punch points closed with the EPC team.

ST-10

Handover

Workfront released — documented and string-ready.

OBS-04 / Programme log

Proven on the UAE's
flagship solar parks.

Specialist subcontractor to L&T Construction at Mohammed bin Rashid Al Maktoum Solar Park — across the 1,800 MW DEWA VI programme and DEWA III.

MECHANICAL CAPACITY — MW ● DELIVERY BOARD

DEWA VI · Phase B97 MW
Handed over — 100%
DEWA VI · Phase C70.5 MW
Handing over

FOUNDATIONS — PILES ● DELIVERY BOARD

DEWA VI · Phase A18,526
Handed over — 100%
DEWA VI · Phase C18,000
Handing over
DEWA III · pipeline17,500 / 100,000
Ongoing — awarded vs. expected programme volume
ProjectScopeQuantityStatus
DEWA VI — Phase A1,800 MW programme
Micro piling & concrete works · ARCS
18,526 piles
Handed over
DEWA VI — Phase B1,800 MW programme
Tracker & module installation · ARCS
97 MW
Handed over
DEWA VI — Phase C1,800 MW programme
Ramming & micro piling of tracker posts
18,000 piles
Handing over
DEWA VI — Phase C1,800 MW programme
Tracker & module installation
70.5 MW
Handing over
DEWA IIIMBR Solar Park — Phase 3
Micro piling — 17,500 awarded · 100,000 expected
100,000 piles
Ongoing

EPC / main contractor: L&T Construction · Location: MBR Al Maktoum Solar Park, Al Qudra Road, Dubai

Night drilling operations
F-01Night shift — DTH drilling, DEWA III
Concrete casting at night
F-02Concrete casting & stub setting
Tracker installation field
F-03Tracker rows — Phase B
Site crew toolbox talk
F-04Toolbox talk — daily HSE briefing
Drilling rigs on the workfront
F-05Auger rigs on the workfront
OBS-05 / Company

Built fast. Proven faster.

2024 — Dubai, UAE

Licensed & mobilised

SunX Solar Energy Systems Installation Co. L.L.C licensed by DET Dubai; crews mobilised to MBR Al Maktoum Solar Park as specialist subcontractor to L&T Construction.

Dec 2024

Triple ISO certification

Quality, environmental and OH&S management systems certified — ISO 9001, 14001 and 45001.

DEWA VI — Phase A

18,526 piles handed over

Full piling and concrete works package for the PV area delivered, inspected and handed over.

DEWA VI — Phase B

97 MW handed over

Complete tracker, module and ARCS installation package — delivered and handed over.

2026 — In progress

Phase C handover + DEWA III ramp-up

18,000 foundations and 70.5 MW in final handover on Phase C; DEWA III micro piling scaling from 17,500 awarded piles toward a 100,000-pile programme.

1,800 MW
DEWA VI programme footprint
4
DEWA project scopes executed
Ø300 mm
Micropiles to design depth
10-station
Inspection-driven workflow
2 shifts
Day & night execution
ISO
9001 · 14001 · 45001

Led by managing partners Saad Malik (CEO) and Muhammad Waseem (Project Manager — COO), SunX runs dedicated engineering, QA/QC, HSE, survey, logistics and commercial functions — scaled trade-wise to each programme's lookahead.

OBS-06 / Certified systems

Independently certified.
Quality, environment, safety.

ISO 9001:2015 certificate
ISO 9001:2015
Quality Management System
CERT AMER22859
SCOPE — INSTALLATION OF SOLAR ENERGY SYSTEM
VALID TO DEC 2027
ISO 14001:2015 certificate
ISO 14001:2015
Environmental Management System
CERT AMER22860
SCOPE — INSTALLATION OF SOLAR ENERGY SYSTEM
VALID TO DEC 2027
ISO 45001:2018 certificate
ISO 45001:2018
Occupational Health & Safety
CERT AMER22861
SCOPE — INSTALLATION OF SOLAR ENERGY SYSTEM
VALID TO DEC 2027

Certified by Americo Quality Standards Registech — UAF accredited · IAF MLA member. Licensed in Dubai (DET trade license 1381806).

"One star powers everything we build. We make sure nothing between it and the grid is left to chance."

SunX Solar — Energising Tomorrow, Today!

OBS-07 / Start a project

Put SunX on your
next workfront.

For prequalification packs, tender enquiries and execution support across the UAE's utility-scale programmes — reach the team directly, or send a brief through the panel.

OfficeOffice 301, Rag Tower, Al Barsha First, Dubai, UAE · P.O. Box 32925

LEGAL — SunX Solar Energy Systems Installation Co. L.L.C
LICENSE — 1381806 · DET Dubai   ACTIVITY — Solar Energy Systems Installation
TRN — 104644383200003   CHAMBER — Dubai Chamber No. 544083

Enquiry panel

Opens in your mail client — sent to info@sunxsolar.ae